• Local Produce
  • Buy Local
  • Local Seafood
  • Local Food
  • Local Music
  • Local Art
  • Local Churches

CAPE CHARLES MIRROR

Reflections on Cape Charles and the Eastern Shore

  • Local Services
  • Local Rentals
  • Local Employment
  • News
  • Opinion
  • Classifieds
  • PODCAST
  • Pets
  • Contact Us

Oyster Restoration Resumes in Virginia’s Lynnhaven River

October 27, 2019 by Wayne Creed Leave a Comment

After a two-year hiatus, reef construction is back in action, thanks in part to NOAA funding.

NOAA – It has been roughly two years since construction of restored oyster reefs was under way in Virginia’s Lynnhaven River, but thanks to NOAA funding, that project is back in action. Construction in at least two sites in the river recently got under way, using hard substrate and fossil shell to build the hard reefs on which spat—baby oysters—settle.

The Hampton Roads Oyster Restoration Workgroup, which coordinates the large-scale oyster restoration project in the Lynnhaven, developed a “blueprint” to guide oyster work there. That plan calls for 154 acres of healthy oyster reef in the river. Initial surveys indicated that 36 acres of healthy oyster reef already existed, and 54.6 acres have been restored thanks to the combined efforts of the U.S. Army Corps of Engineers, Virginia Marine Resource Commission, and Lynnhaven River Now—leaving 61.4 acres to restore.


Oyster reef construction on Virginia’s Lynnhaven River includes moving substrate from a barge into the water to form a reef. (NOAA Photo)

The current construction aims to restore between 10 and 12 acres, bringing the effort significantly closer to its goal. Roughly $575,000 in NOAA funding—from the NOAA Chesapeake Bay Office, Office of Habitat Conservation, and Habitat Protection Division—enabled the Virginia Marine Resources Commission to contract with a company to do this work.

Additional efforts toward the 154-acre goal—including a project funded by the National Fish and Wildlife Foundation and implemented by the Chesapeake Bay Foundation and Lynnhaven River Now, as well as work by the U.S. Army Corps of Engineers—are slated for spring 2020.

Work in the Lynnhaven River is one component of an overarching goal, set by the Chesapeake Bay Program in the Chesapeake Bay Watershed Agreement, to restore oysters to 10 Chesapeake Bay tributaries by 2025.

The Hampton Roads Oyster Restoration Workgroup, which coordinates restoration efforts in the Lafayette and Lynnhaven rivers, is part of the Chesapeake Bay Program’s Sustainable Fisheries Goal Implementation Team. The Workgroup includes the National Oceanic and Atmospheric Administration (NOAA) (cochair), U.S. Army Corps of Engineers’ Norfolk District (USACE) (cochair), Chesapeake Bay Foundation (CBF), Christopher Newport University (CNU), City of Norfolk, City of Virginia Beach, Elizabeth River Project (ERP), Virginia Commonwealth University, Virginia Institute of Marine Science (VIMS), Lynnhaven River NOW (LRN), Pleasure House Oysters, and Virginia Marine Resources Commission (VMRC).

Filed Under: Bottom, News

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Search

Join the Conversation!

Send letters, opinion, goings on or photos to capecharlesmirror@gmail.com

Mirrors

Recent Comments

  • LuckyVaGirl on Town Council moves forward to investigate sale of utilities
  • Loraine A. Huchler on Citizen Points out Major Flaws in utility Sale
  • Paul Plante on Op-Ed: To Heal the Nation, Biden Must Apologize
  • Paul Plante on Opinion: Making it Up as they Go
  • Paul Plante on Congresswoman Luria Votes for Equality Act
  • Paul Plante on Opinion: Masculine Energy vs. Poncey Leftism
  • Joe McDonald on How many coal-fired power plants are there in the world today?
  • Paul Plante on Op-Ed: To Heal the Nation, Biden Must Apologize
  • Kim on List Of Clinton Associates Who Allegedly Died Mysteriously Or Committed Suicide Before Testimony
  • devon on Congresswoman Luria Votes for Equality Act
  • Scotiagirl on Opinion: Masculine Energy vs. Poncey Leftism
  • Paul Plante on War Pigs: Biden, Democrats Bomb Civilian Targets in Syria
  • Gene Kelly on Gov. Ralph Northam loosens some Covid Restrictions
  • Paul Plante on Congresswoman Luria Votes for Equality Act
  • Stuart Bell on Judge has dismissed a $6 million lawsuit against the Chesapeake Bay-Bridge Tunnel
  • LuckyVaGirl on Citizen Points out Major Flaws in utility Sale
  • Paul Plante on Citizen Points out Major Flaws in utility Sale
  • Sara on War Pigs: Biden, Democrats Bomb Civilian Targets in Syria
  • Sara on Congresswoman Luria Votes for Equality Act
  • Paul Plante on Op-Ed: To Heal the Nation, Biden Must Apologize

Trending Now

  • VMFA Artmobile coming to the Shore in April
  • Citizen Points out Major Flaws in utility Sale
  • Cape Charles: current FOIA Request Looks at Coastal Precast Concrete Plant
  • Complaints and Ilegal Construction in Cape Charles
  • February 2021 Rainfall takes a toll on the Shore
  • New Word: White Adjacent
  • List Of Clinton Associates Who Allegedly Died Mysteriously Or Committed Suicide Before Testimony
  • Judge has dismissed a $6 million lawsuit against the Chesapeake Bay-Bridge Tunnel
  • How many coal-fired power plants are there in the world today?
  • Black History Month: Amazon Drops Clarence Thomas documentary...during BHM?

Subscribe to CC Mirror via Email

Enter your email address to subscribe

Copyright © 2021 · News Pro Theme on Genesis Framework · WordPress · Log in