October 12, 2025

2 thoughts on “Cape Charles to request $875,000 in Port Authority Grants

  1. Did it occur to anyone that maybe this study should have been done before the floating docks were built? The same people are making this decision.

    1. Well, actually yes. A wave study was conducted before the floating docks were built. The result was the current planned configuration of 5 breakwaters on the shoal to the west of the harbor entrance. The recommendation was that 2 needed to be built before installation of the floating docks to provide reasonable protection. Three have now been built. They provide adequate protection except during certain conditions and extreme weather events. The 4th breakwater would be built to the south of the existing 3 to better protect against waves created by prevailing southwest summer winds. However, it would be in the deepest water depth on the shoal and therefore the most expensive breakwater to build. The new wave study, using newer state of the art modeling, will evaluate several alternatives so that a cost-benefit analysis can be conducted. This will allow the Town Council to make a better informed decision recognizing current conditions.

Leave a Reply

Your email address will not be published. Required fields are marked *