The Wastewater plant treated an average of 142,949 gallons as of April 15, 2022. The most used was 171,769 gallons on 4/09/2022. The staff conducted normal maintenance, including work on the emergency holding tank, and washing down the entire plant.
The Water Plant produced 989,438 gallons, 130,000 used for processes. The top usage occurred on April 8th, with 183,133 gallons produced. The average was 141,348 gallons per day.