Wastewater Notes
The Wastewater plant treated an average of 170,683 gallons a day. The highest usage was on May 17, using 202,625 gallons. Utility Staff continued daily water quality testing and analysis, submitted Monthly reports completed for VDH.
Water Plant
Staff Performed Daily water quality testing and analysis, and submitted Monthly reports for VDH.
Water Usage:
- WTP operated for 82 hours with the average daily operation of 11.7 hours
- 1,141,904 gallons produced with approx. 145,000 gallons used for processes
- 163,129 average daily production with peak of 205,594 on 5/7/23
(5/12-5/18) - WTP operated for 87.5 hours with the average daily operation of 12.5 hours
- 1,234,318 gallons produced with approx. 145,000 gallons used for processes
- 176,331 average daily production with peak of 197,017 on 5/12/23

Actually Jacob, a majority of these events are created by recreational boaters pumping their holding tanks out into the water.…
From the spill in the Elizabeth River no doubt
"Pedestrians have the right of way." -Famous last words-
Pedestrians always have the right of way.
In other words there will be potential bike path injuries and deaths. Idiot drivers vs knucklehead bike riders vs 12…